Work Program

//Work Program
Work Program2017-08-01T15:31:48+00:00

Klondike Silver’s plans for fiscal 2018 (June 2017 – May 2018)

  • Reactivate the 4625 portal and adit.

  • Reactivate the upper workings of the Silvana mine (4625, 4690 and 4755).

  • Locate and validate the broken mineralization in the upper workings of the Silvana by sampling and surveying.

  • Locate un-mined zones from the last historic mineral estimate (1993).

  • Electronically digitize historical mine maps and create an underground 3D geological model

  • Fly a LIDAR topographical survey on the Klondike Silver property and combine it to the 3D underground geological model.

  • Identify and prioritize underground drill targets in the upper levels of the Hope/Silvana/Carnation mines from the 3D underground geological model.

  • Establish underground drill stations and rehabilitate the lower Carnation mine levels.

  • Underground drilling (initially 1,000 – 1,500 metres) of strategic targets.

  • Evaluate the mineral potential of the Silversmith 10 Level dump for high grade zinc mineralization.

  • Evaluate the mineral potential of the Silversmith 5 / Slocan Star Level dumps for high grade zinc mineralization.

  • Re-condition the Klondike Silver mill and tailings management facility for processing mineralized feed.

Talk To Us

Call us directly at

Signup Now