Klondike Silver’s recent accomplishments and plans for fiscal 2020 (June 2019 – May 2020)
Rehabilitate ground support of the 4625 Cross-Cut and 4625 West Lateral Drift [Completed].
Application to amend Mine Permit M-25 for Phase One and Two Underground Exploration Drifting and Diamond Drilling. [Completed].
Exploration Drifting Phase One (80 m) [Completed].
Exploration Diamond Drilling Phase One (~13 holes, 1030+ m) [Started January 2019]
Exploration Drifting Phase Two (80 m).
Exploration Diamond Drilling Phase Two (~13 holes, 1030+ m).
Evaluate the mineral potential of the Silversmith 10 Level dump for high grade zinc mineralization.
Evaluate the mineral potential of the Silversmith 5 / Slocan Star Level dumps for high grade zinc mineralization.
Re-condition the Klondike Silver mill and tailings management facility for processing mineralized feed.